Precast Frames
Single Storey - Industrial Frames
Portal Frames
A Portal Frame is a frame consisting of precast columns connected at the top by a pitched or
sloping horizontal beam. The low pitched roof typically has a 4 slope. Portal Frames are economical to produce and are often associated with industrial or warehouse buildings where a clear span of up to 35m or more is required. It is straightforward to design, provided the flexural rotations at the end of the main portal are achieved. Generally a neoprene pad (or other durable pad) is inserted at the bearing to facilitate this flexibility and to avoid potential damage to the bearing ledge.
Additional Floors
In the case of Portal Frames, first floors or mezzanines can be easily constructed by creating a corbel in the column element to facilitate the installation of a secondary post and beam.
Dowel bar or pinned connections are generally applied between the column and rafter sections. The horizontal load acting on the gable walls is distributed to the outer columns by single bay (sometimes multi-bay) roof bracing and gable bracing at each end of the building. The diaphragm action of the roof also contributes to the stability of the building.
Multi-Storey Column & Beam .jpg)
Much of precast construction is Column & Beam. Todayís Column & Beam frames are considerably more advanced than earlier structures. In particular, jointing techniques and composite action between columns, floors and beams have been developed. These have contributed greatly to increases in span capability, material efficiency and reduced costs.
Multi-storey buildings can have different column configurations. The most common type of structure is composed of a combination of continuous (multi-storey) columns at the perimeter and floor to floor (single storey) columns on the inner structure. Other options are to use either single storey or multi-storey columns throughout the structure.
Continuous columns (bypassing each floor) have a corbel at each floor level to support the surrounding
beams. Spandrel beams are typically positioned between the continuous columns on each elevation. Columns can be manufactured in lengths of up to 24m. However, the most economic length in terms of cost and handling is 15m. The key advantage of continuous columns is speed of installation.
Single storey columns which are jointed at each floor level are more often located inside the perimeter of the building*. Spine beams are typically erected over these columns and are connected using high strength dowel bars in grouted dowel tubes, cast into the beams and columns. Continuous spine beams, resting on and connected to several columns are commonly used. These often cantilever over the end of the last column to facilitate a drop-in beam. See Detail, page 15.
With this method of precast construction, buildings are erected one floor at a time with beams placed at the head of columns at one level before the upper level columns are erected and connected through the beams to the columns below.
*Note
Structures using single storey columns at the perimeter are not uncommon. These structures have continuous edge beams which are jointed to the columns using high tension steel dowels grouted into dowel tubes cast into both columns and beams.
Typically, multi-storey precast buildings consist of a combination of Column & Beam and Cross Wall construction where the benefits of each are used to optimise structural and cost efficiencies. Lift shafts and gable walls are common cross wall elements used in conjunction with Column & Beam structures, adding significantly to the structural stability of the building.
Minimising Beam Depth
Reducing the depth of the beam effectively reduces the depth of the services void (i.e. the space between the false ceiling and the floor soffit). This in turn reduces the height of the building which results in cost savings. Minimising beam depth is particularly important where a computer floor or other raised floor is required, increasing the overall floor height.
Composite Beams
Composite beams are frequently used to minimise the beam depth. However, with a composite beam the final loading capacity will not be achieved until the screed is applied. Therefore, in the temporary condition, temporary propping may be required to avoid over-stressing or excessive deflection of the beam.
To download the ICF Precast Concrete Frames Guide